The WETWINE software allows you to quickly and easily simulate the optimal configuration of a wine effluent treatment system based on natural constructed wetland technologies.

In order to do this, it is necessary to introduce a series of parameters that will allow an approximate calculation for the particular case of each winery, obtaining the following information as a result:



A pre-dimensioning of the plant

Approximate investment and maintenance costs

An analysis of the environmental impact in comparison with other effluent management systems.

Information on applicable regulations based on the location of the winery.


Only numbers allowed
m3/year
Only numbers allowed
m3/year
*required fields
The harvesting period is understood to be the period from when the grapes are first harvested until the end of fermentation.
pH must be between 2.5 and 12.5
TSS must be between 100 and 7,500
mg/L
tCOD must be between 300 and 45,000
mg/L
BOD5 must be between 200 and 40,000
mg/L
Total N must be between 5 and 65
mg/L
Total P must be between 5 and 80
mg/L
Only numbers allowed
m3
Only numbers from 0 to 365 are allowed
días
*required fields
Non-harvest data are understood to be data corresponding to the period between the end of fermentation in one campaign and when the grapes are first harvested in the next campaign.
pH must be between 2.5 and 12.5
El SST debe estar comprendido entre 20 y 7.500
mg/L
El DQOt debe estar comprendido entre 50 y 45.000
mg/L
BOD5 must be between 200 and 40,000
mg/L
Total N must be between 5 and 65
mg/L
Total P must be between 5 and 80
mg/L
Only numbers allowed
m3
Para realizar el cálculo con caudales, por facer rellene ambos campos
*required fields
The results have been sent successfully to the email address provided
If you don't find the email in your inbox, please check your spam folder